Please post pictures!!! I'd love to see what abortion was constructed to save .2% of floorspace. Some buildings (universities and national defence buildings come to mind) have large easy to access and well laid out machine rooms with print tables and parts storage. Then theres some where the mechanics had to remove the controller from the tank to get them down the stairs to some far corner. I have one, thats in a shed in the back. Yep, bout 100 feet of buried piping laid in 1968. The machine room leaked, so they built another floor and moved everything up one level. Classic.



   
ReplyQuote
(@uppo72)
Honorable Member
Joined: 17 years ago
Posts: 562
 
Originally Posted By: GreenPants
you guys have obviously never dug into a otis next-step escalator.

GP is that a NCE type? While not that bad to work on, escalators are really a pain in the arse ie removing steps, hand rail drives etc. We had a main step bearing callapse and was an absolute nightmare to repair.



   
ReplyQuote
(@justintime)
Eminent Member
Joined: 17 years ago
Posts: 17
 
You're crazy. Siemen's soft starters are great. Also how could you say I2, I3 and EECO valves are bad? Learn how to adjust them. They seem to hold the adjustments well. Ever worked on a Blain valve? They don't seem to hold an adjustment as well. Just my opinion though.



   
ReplyQuote
(@justintime)
Eminent Member
Joined: 17 years ago
Posts: 17

   
ReplyQuote
(@sbrmilitia)
Honorable Member
Joined: 17 years ago
Posts: 448

   
ReplyQuote
(@smitty)
Reputable Member
Joined: 17 years ago
Posts: 220
 
You guys weren't even close.
Try Serge relay controllers
Haughton GAC1
Cvt 8800 full control ie Thames Valley
World Class
Otis MRV



   
ReplyQuote
(@rac66)
Trusted Member
Joined: 17 years ago
Posts: 68

   
ReplyQuote
(@rolly)
Honorable Member
Joined: 17 years ago
Posts: 729
 
The battery Otis is MRVF. Your all correct it is a POS. There were 400 Units in the USA and Otis spent 20 Million to make them run. I asked why not just spend that money on MOD and the answer was we have to give the customer what they bought to run without Building Power.



   
ReplyQuote
(@uppo72)
Honorable Member
Joined: 17 years ago
Posts: 562

   
ReplyQuote
 mjm
(@mjm)
Eminent Member
Joined: 17 years ago
Posts: 23

   
ReplyQuote
 mjm
(@mjm)
Eminent Member
Joined: 17 years ago
Posts: 23

   
ReplyQuote
 mjm
(@mjm)
Eminent Member
Joined: 17 years ago
Posts: 23

   
ReplyQuote
(@elmcannic)
Honorable Member
Joined: 17 years ago
Posts: 635
 
"Flops and Bad designs" huh? Lemme see....
For me...MRL's are bad design. I get the whole "usable space" thing and "Eco friendly" line, but unable to see a machine, working on a brake issue in the overhead where you need at least two mirrors and two more arms, seismic devices mounted on a plywood floor in a dorm? Please....
Next up would be TKE's blue ribbon winner "Cheapest Fixtures in The World". And a simple button repair is out as it seems there are no less than four generations of buttons that cannot interchange parts...nice.
And not to bang TK twice, but when in the world are those engineers going to design a floating selector box? C'mon!
Everything is great when it runs, but in a world of ADON boards, IOA's and D's...
redundant I/O's man it can be tough.
But then there is the old Amtech hydro with those stupid Midtex relays...50/50 chance you'll plug it in without bending one of those tin foil contact base fingers. I always felt I had to pull it out again just to see if they all went in.
There's more, but I'll leave that to the next poster.
Oh....remember the U.S. Diplomat selector system? Wild.



   
ReplyQuote
(@jcjphoenix)
Reputable Member
Joined: 17 years ago
Posts: 239

   
ReplyQuote
Page 2 / 3
Share:
Scroll to Top