Elevator Forum

NewMech
@newmech
Estimable Member
Joined: Jan 1, 2010
Topics: 22 / Replies: 181
Reply

Back contacts on BR not allowing proper operation of suicide circuit. Meter between two adjacent MG brushes, the generator is probably building an out...

7 years ago
Reply

Car is back in service. I tried a REINIT, did not work. INIT did work. I built a new floor table and the car was off and running. Any time I hit a ter...

8 years ago
Reply

I believe that U37 and U38 are the BATRAM chips, they were for sure swapped to the new CPU. The CPU was replaced because I could not communicate with ...

8 years ago
Topic
Replies: 5
Views: 5387
Reply

311 and or 411 do not need to be on inspect, you are correct. 211 for sure has to be on inspect.

8 years ago
Reply

You must be on controller inspection to change parameters.

8 years ago
Reply

Why were the field coils replaced?

8 years ago
Reply

If increasing your NTSD tolerance does the trick, that is a good indicator that your NTSD vane is the wrong length.

8 years ago
Reply

Only one batram chip is really used, the other is backup. You are leaving the bad one in the backup socket on the board.

8 years ago
Reply

What do you mean by won't recognize?

9 years ago
Reply

Originally Posted by Tamperprufe Just sent you info on tool part # Would you mind sending that info to me as well?

9 years ago
Reply

Looks like an ESI to me. Otis used to install that controller as part of a Cemco roped hydro package.

9 years ago
Reply

I had a similar issue with a Cedes edge recently. The DC return wire was crimped on the insulation inside the connector. I could duplicate my problem ...

9 years ago
Reply

2819 is your culprit. Your PULSE unit is in alarm.

9 years ago
Reply

Clear the motion fault logClear the motion power failure ramMotion reset 2-2-3-1

9 years ago
Page 4 / 14
Scroll to Top