Elevator Forum

solidstate
@solidstate
Prominent Member
Joined: Jan 1, 2010
Topics: 139 / Replies: 504
Reply

Dont know about a written procedure. It is pretty straight forward. We use c clamps to keep the spool from unraveling and of course do bottom or top o...

6 years ago
Reply

PM or post email

6 years ago
Reply

Thanks, and will keep it posted.

6 years ago
Reply

The only CEMCO print I have is from 2001 and does not have Fire Service in it. On this print the start of the car and hoist way door lock circuit is t...

6 years ago
Reply

Update after Johnny's post.....01/27/2021 We turned the power on to number 2 but left CPU card off and on inspect. Car 3 did not fault out at all. 02/...

6 years ago
Reply

Never saw that before and in addition, I did not think Phase two was allowed on a LU/LA in any event. That aside... does it matter if any hoist way do...

6 years ago
Reply

We have not scoped the lines but did replace them. They do not run in shared conduits and we have the encoder wires alone in conduit.

6 years ago
Reply

Yes power is off, but we will try it with car 2 on inspect and power on.

6 years ago
Reply

Problem has never gone away and we have been trying different things to get to the bottom of it. Still no luck. Group of three, car three is the one t...

6 years ago
Reply

I have an 2007 print. Page 9 states must have two outputs for the door to unlock. Output 11 (E1) which flows the return to all the interlocks and for ...

6 years ago
Reply

Should have a door zone input or a switch just for that floor. If you put 24 volts to it from the controller and it works?

6 years ago
Reply

We could not find anywhere either and Vertical express was not much help. If you do find a part number please post it. We tried Adams, sees, and the o...

6 years ago
Reply

It is impossible to compete with them on the MRL Traction side. Schlindler is even cheaper. You can try Alliance elevator, but again it is not possibl...

6 years ago
Reply

Pm or post an email

6 years ago
Reply

I will follow up on the issue as we progress. So far we know the terminals at 2 and 3 for rail XT+T have to be bridged to enable normal car call opera...

6 years ago
Page 17 / 43
Scroll to Top