Elevator Forum

Mce overlay for hol...
 
Notifications
Clear all

Mce overlay for hollister Whitney rope gripper

6 Posts
5 Users
0 Reactions
7,223 Views
(@elevatorfella)
Estimable Member
Joined: 17 years ago
Posts: 102
Topic starter   [#2961]
911 guys.. Have a duplex unit with single "swing panel" controlling both units. Wired rope gripper control panels in and installed new relay boards from mce. They sent a new U9 chip which was installed and both units went nuts. Push car call 5 and car would go to 2 for example. Put old U9 chip back in and elev. 1 works fine. Elev 2 still has " stepping issues" 10 stops on both units. Elev. 2 will run from LL to 5 fine if I put a 6,7,8,9 floor call in unit will go to top floor slow down and hit top normal limit. We think that swapping the EEPROM chips around we need to readdress the floor designations?? Are we on the right track......thanks for any help



   
Quote
(@elevatorfella)
Estimable Member
Joined: 17 years ago
Posts: 102
Topic starter  
Guys I feel so stupid, got the problem solved today.............broken travel cable wire for DZ.....used a spare and we are good.



   
ReplyQuote
(@kiwinightstalker)
Estimable Member
Joined: 17 years ago
Posts: 145
 
hey there are no stupid questions!!!!...someone somewhere might have the same fault and you have might have saved them days of fault finding...and kept a customer happy and even in these days of tight budgets dare I say a contract!!!.



   
ReplyQuote
(@j-sand)
Estimable Member
Joined: 17 years ago
Posts: 100

   
ReplyQuote
(@broke-sheave)
Reputable Member
Joined: 17 years ago
Posts: 418

   
ReplyQuote
(@uppo72)
Honorable Member
Joined: 17 years ago
Posts: 562

   
ReplyQuote
Share:
Scroll to Top