Elevator Forum

Recently completed ...
 
Notifications
Clear all

Recently completed Otis to TKE MOD

17 Posts
10 Users
0 Reactions
21.1 K Views
(@lepricon)
Eminent Member
Joined: 17 years ago
Posts: 18
Topic starter   [#3381]
Recently completed Otis to TKE MOD

Hi Gang,

Just thought I would pass on some pictures of a mod I just wrapped up.

Old Equipment:

Otis 131HT Machines
Otis VIP 260 with a good ole MG set
Otis 6970 door operator

New:

Otis 131HT machines ( refurbished )
TKE Tac 50-04 with PWM 10K drive Gov/Motor encoders
Hollister Whitney 624 rope gripper
Dover HDLM door operator

Enjoy

Dave

[img] [/img]
[img] [/img]
[img] [/img]
[img] [/img]
[img] [/img]

[img] [/img]
[img] [/img]
[img] [/img]
[img] [/img]



   
Quote
 Vic
(@vic)
Honorable Member
Joined: 17 years ago
Posts: 532
 
Very clean job, looks great!

You guys put taller machine blocking under the 131HTs, to make room for the rope grippers?

They look a bit higher, compared to the "before" pics.



   
ReplyQuote
(@uppo72)
Honorable Member
Joined: 17 years ago
Posts: 562

   
ReplyQuote
 jkh
(@jkh)
Prominent Member
Joined: 17 years ago
Posts: 904

   
ReplyQuote
(@greenpants)
Reputable Member
Joined: 17 years ago
Posts: 276
 
nice job. you def know it wasnt a otis mod because you can still get to the machine. we have to cover ours with guards so kids can play in the machine room i guess.



   
ReplyQuote
(@broke-sheave)
Reputable Member
Joined: 17 years ago
Posts: 418

   
ReplyQuote
(@smitty)
Reputable Member
Joined: 17 years ago
Posts: 220
 
Very nice looking job! We are doing a similar job right now but using the MCE I control. I hope to post some pictures myself when it is done. We had to do the same deal to make the rope grippers work.



   
ReplyQuote
(@lepricon)
Eminent Member
Joined: 17 years ago
Posts: 18
Topic starter  
Originally Posted By: uppo72
why the rope grippers? is it a reg or just a spec requested via the tender?

In Canada we have to have rope grippers when we complete a major alteration (MOD ) or have parallel main brakes that can stop 125% rated load independent of each other.

In the past we used to mount the rope grippers upside down at the top of the hoistway. The government inspector had us remove it and install it up in the machine room. He called it because it was not "serviceable"

This was a right pain in the ass to raise these machines.

The next MOD I am supposed to run we will have to raise Otis 219HT machines up to accommodate a rope gripper .

YUK!



   
ReplyQuote
(@uppo72)
Honorable Member
Joined: 17 years ago
Posts: 562
 
Originally Posted By: lepricon
Originally Posted By: uppo72
why the rope grippers? is it a reg or just a spec requested via the tender?

In Canada we have to have rope grippers when we complete a major alteration (MOD ) or have parallel main brakes that can stop 125% rated load independent of each other.

In the past we used to mount the rope grippers upside down at the top of the hoistway. The government inspector had us remove it and install it up in the machine room. He called it because it was not "serviceable"

This was a right pain in the ass to raise these machines.

The next MOD I am supposed to run we will have to raise Otis 219HT machines up to accommodate a rope gripper .

YUK!

interesting. why do you have to have 2 brakes independant of each other? if control is designed properly why would you need to have 2 brakes?



   
ReplyQuote
(@lepricon)
Eminent Member
Joined: 17 years ago
Posts: 18
Topic starter  
You need a second independent brake OR a rope gripper For Unintended motion code req's...

Once you mod any old equipment they must be brought up to today's code.



   
ReplyQuote
(@uppo72)
Honorable Member
Joined: 17 years ago
Posts: 562
 
Originally Posted By: lepricon
You need a second independent brake OR a rope gripper For Unintended motion code req's...

Once you mod any old equipment they must be brought up to today's code.

i would of thought that if the lift had unintended motion that a lift would stop even with 1 or 2 brakes.i would hope we dont go down this way. there have been some rope grippers installed and i had to walk 27 flights to reset 2 grippers when a power failure occured. also are new lifts required to have these 2nd brakes installed?

Last edited by uppo72; 05/05/12 12:39 PM.


   
ReplyQuote
(@tommycakes)
Eminent Member
Joined: 17 years ago
Posts: 31

   
ReplyQuote
(@scott-davidson)
Honorable Member
Joined: 17 years ago
Posts: 402
 
thats very nice lepricon, the old otis controllers looked great, now that was service you could see. Kind of sad to see such a great looking otis controller go down. the mod does look awesome though great job



   
ReplyQuote
(@smitty)
Reputable Member
Joined: 17 years ago
Posts: 220
 
It is interesting that a lot of our current US codes have been in Canada's code for quite some time. I remember visiting my father who was a supervisor for then Dover Elevator in Toronto. I was a field adjuster for Schindler Haughton at the time. Anyhow, this was back in the mid 90's. and I remember seeing some of the gearless machines with dual brakes as well as the Bode brake used on geared machines. It was also odd seeing the rather small looking but 600 volt main line disconnects.

Last edited by Smitty; 05/22/12 03:40 AM.


   
ReplyQuote
 E311
(@e311)
Reputable Member
Joined: 17 years ago
Posts: 363
 
Very pretty 🙂 In the before pics that job looked pretty good. Its always nice to see the 260's get ripped out. Now hopefully the service guy will keep it that clean ☹️



   
ReplyQuote
Page 1 / 2
Share:
Scroll to Top